There are two main construction project strategies: design-build and design-bid-build. It's crucial to select the one that will best meet your needs because each has specific benefits and drawbacks. In this blog post, G2 General Contractors will discuss the differences between these two strategies and assist you in selecting the one that will work best for your building project.

What is Design-Build?

The design-build method of construction delivery involves hiring a single company, the design-build contractor, to handle both the design and building stages.

Advantages of Design-Build:

Allows for a streamlined process:

Design-build offers a streamlined process because the design and construction phases are contracted out to a single entity. This can save time and money.

Creates a more collaborative environment:

Design-build creates amore collaborative environment between the design and construction teams. This can lead to better communication and fewer problems.

Can be less expensive:

Design-build can be less expensive than traditional design-bid-build because the design-builder is usually responsible for both the design and construction phases. It leaves less room for errors as constant communication between the different project teams.

Disadvantages of Design-Build:

The owner has less control:

Since the contractor handles both the design and building stages, the owner has less control over the project.

There is less competition:

There is less competition because the design-builder is usually chosen through a negotiation process instead of a bidding process.

What is Design-Bid-Build?

Design-bid-build (DBB) is the traditional way of procuring a construction project. The owner contracts with an architect or engineer to design the project and then solicits bids from contractors to build it. The owner awards the contract to the lowest bidder.

Advantages of Design-Bid-Build:

The owner has more control:

The owner has more control because they are not involved in the design process.

It is less risky:

It is less risky because the contractor is only responsible for the project's construction phase.

Disadvantages of design bid build:

It can be more expensive:

It can be more expensive because the owner has to pay for the project's design phase separately from the construction phase.

It can take longer:

It can take longer because the design and construction phases are separate.

Which strategy should you choose?

The best strategy for your project will depend on your specific needs and goals. A traditional design bid build may be better if you want more control over the project. Design-build may be the way to go if you're looking for a less expensive and faster option. Talk to your contractor about which strategy would work best for your project.

Contact G2 General Contractors serving McKinney for your next project; we can meet any requirement, from little projects to bigger ones. Our skills and knowledge work together to solve even the most challenging issues in your building projects.